-
UK Delivery (2 Working Days)
-
Satisfaction Guaranteed.
-
Secure Payments
-
Need help? Call Us 01744 520 110 or email sales@industrialsuppliesco.co.uk
Our products have been used by
Logos are for illustrative purposes only and do not imply official endorsement
Description
Supercoat Non-Slip Garage Floor Paint – High-Impact Factory Grade Coating
Premium factory-grade floor coating engineered for extreme industrial environments. Delivers superior non-slip safety, exceptional impact resistance, and long-term durability on warehouse floors, production facilities, loading bays, and high-traffic commercial garages.
Professional Performance Features
- Superior Non-Slip Performance: Advanced textured aggregate provides maximum grip and safety in wet and dry conditions – exceeds HSE workplace safety requirements
- High-Impact Formula: Specially engineered to resist heavy machinery, pallet jacks, forklift traffic, and constant vehicle movement without chipping or delamination
- Factory-Grade Durability: Professional coating trusted by industrial facilities, warehouses, and distribution centres across the UK for 10+ year lifespan
- Exceptional Wear Resistance: Withstands dropped loads, dragged pallets, steel-wheeled equipment, and abrasive traffic that destroys standard floor paints
- Chemical & Oil Resistant: Repels industrial chemicals, hydraulic fluids, oils, fuels, solvents, and cleaning agents – easy to clean without staining
- Fast Cure System: Walk-on in 24 hours, light traffic in 48 hours, full industrial use in 7 days – minimises facility downtime
- 17 Professional Colours: Comprehensive colour range for safety zoning, traffic management, walkway designation, and corporate branding
Technical Specification
| Property | Performance |
|---|---|
| Coating Type | High-impact polyurethane resin, textured non-slip |
| Finish | Semi-gloss with heavy-duty aggregate (slip resistance R11) |
| Pack Size | 20 Litres |
| Coverage Rate | 8-10 m² per litre (depends on substrate porosity) |
| Total Coverage | 160-200 m² per 20L tin (2 coats) |
| Dry Film Thickness | 120-180 microns per coat (high-build) |
| Touch Dry | 6-8 hours at 20°C, 50% RH |
| Recoat Time | 16-24 hours (minimum) |
| Walk-On Time | 24 hours (light foot traffic) |
| Light Traffic | 48 hours (vehicles, forklifts) |
| Full Industrial Use | 7 days (maximum hardness & impact resistance) |
| Application Temp | +10°C to +25°C (substrate and ambient) |
| Service Temp | -30°C to +80°C continuous |
| Impact Resistance | Superior – withstands dropped loads and heavy impacts |
| Abrasion Resistance | Taber CS17 wear index <50mg (exceptional performance) |
| Chemical Resistance | Resistant to oils, fuels, solvents, acids, alkalis, hydraulics |
| Slip Resistance | R11 rating (DIN 51130) – suitable for industrial wet areas |
| VOC Content | <140 g/L (EU 2004/42/EC compliant) |
| Shelf Life | 12 months unopened in original container |
Professional Application Guide
- Surface Preparation (Critical): Remove all oil, grease, dirt, laitance, and contamination. Industrial degreasing essential. Concrete must be fully cured (minimum 28 days), dry (<4% moisture), and structurally sound. Shot-blast or grind to achieve CSP-3 to CSP-4 profile for maximum adhesion in high-traffic areas.
- Structural Repairs: Fill cracks, spalls, and damaged areas with high-strength epoxy or polyurethane concrete repair compound. Allow full cure before coating. Expansion joints must remain flexible – mask and do not coat over.
- Priming (Mandatory for Industrial Use): Apply Pre-Seal primer to all concrete substrates. Primer seals surface, improves adhesion, reduces coating absorption, and ensures maximum bond strength. Allow 4-6 hours cure before topcoat application.
- Mixing: Stir thoroughly for 3-5 minutes before use and periodically during application. High-build formulation requires vigorous mixing to suspend aggregate evenly. Do not thin – formulated for optimal viscosity and non-slip performance.
- First Coat Application: Apply by brush (stiff synthetic bristle), roller (12-15mm heavy-duty pile), or airless spray (0.023-0.027" tip, 3000-3500 PSI). Apply generous, even coat working in 2m x 2m sections. Maintain wet edge to avoid lap marks.
- Second Coat Application: After 16-24 hours, apply second coat perpendicular to first coat direction for optimal coverage, impact resistance, and non-slip performance. Ensure complete coverage with no thin areas or holidays.
- Curing & Protection: Maintain good ventilation. Protect from moisture, dust, and traffic for 24 hours minimum. Avoid light traffic for 48 hours. No heavy industrial use for 7 days. Temperature and humidity significantly affect cure times – extend cure periods in cooler conditions.
Suitable Substrates
Typical Industrial Applications
- Factory production floors and assembly areas
- Warehouse and distribution centre floors
- Industrial storage facilities and racking areas
- Loading bays, dispatch areas, and goods-in zones
- Forklift traffic routes and pallet handling areas
- Commercial garage complexes and service centres
- Automotive workshops and MOT testing facilities
- Multi-storey car parks and parking structures
- Agricultural buildings and machinery storage
- Food processing facilities (when fully cured)
- Manufacturing plants and engineering workshops
- Logistics hubs and freight terminals
Coverage & Pack Size Guide
| Floor Area | 20L Coverage | Application |
|---|---|---|
| 80-100 m² | 2 coats (recommended) | Medium warehouse section or large workshop |
| 160-200 m² | 1 coat | Large warehouse zone (with primer + 1 topcoat) |
| 50-65 m² | 3 coats | Extreme traffic areas or porous substrates |
Coverage varies with substrate porosity, texture, and application method. Porous, rough, or damaged concrete reduces coverage by 30-50%. For large projects, calculate 8 m²/L conservative coverage. Always purchase 15-20% extra for wastage, touch-ups, and future repairs.
Available Colours (17 Professional Shades)
Light Grey, Mid Grey, Dark Grey – ideal for general warehouse and factory floors, hides dirt and wear
Light Blue, Mid Blue, Dark Blue – safety zones, quality control areas, clean rooms
Light Green, Mid Green, Dark Green – pedestrian walkways, safe zones, first aid areas
Tile Red Oxide, Red – hazard areas, restricted zones, fire equipment zones
Black, Brown, Cream, Yellow, White – forklift routes, safety marking, corporate branding, line marking
Pre-Seal – essential porous concrete sealer and primer coat for industrial applications
Use colour zoning to designate traffic routes, pedestrian walkways, safety areas, storage zones, and forklift routes per HSE guidance. Colour samples available for critical colour matching and specification approval.
Performance & Compliance
Slip Resistance: R11 rating per DIN 51130 – exceeds HSE workplace safety requirements for industrial wet areas and heavy traffic zones. Suitable for forklift and pallet jack operations.
Impact Resistance: Superior performance under dropped load testing – withstands impacts that crack or chip standard floor coatings. Ideal for areas with overhead crane operations and material handling.
Abrasion Resistance: Taber CS17 wear index <50mg – exceptional performance significantly exceeding BS 8204 requirements for heavy-duty industrial floor coatings.
Adhesion Strength: >2.5 MPa pull-off strength (concrete failure) when applied to properly prepared substrates per BS EN 1542 – ensures coating remains bonded under extreme traffic.
Chemical Resistance: Resistant to oils, fuels, solvents, dilute acids, alkalis, hydraulic fluids, and common industrial chemicals per BS EN ISO 2812-2.
Fire Rating: Class 1 fire retardant properties – suitable for occupied industrial buildings and public access areas.
VOC Compliance: Meets EU Directive 2004/42/EC and UK VOC regulations for industrial protective coatings.
Food Safety: Suitable for food processing and preparation areas when fully cured (7 days) – conforms to food contact regulations.
Why Supercoat for Industrial Environments?
Supercoat is specifically formulated for the most demanding industrial applications where standard floor paints fail within months. Key advantages:
- Proven in UK Industry: Trusted by major warehouses, distribution centres, and manufacturing facilities for over 15 years
- Superior Impact Resistance: Engineered to withstand dropped pallets, steel impacts, and heavy machinery that destroys standard coatings
- R11 Slip Resistance: Higher slip resistance rating than standard R10 coatings – critical for wet industrial environments
- High-Build Thickness: 120-180 micron DFT provides superior protection vs standard 80-100 micron coatings
- Cost-Effective: 10-15 year lifespan eliminates frequent recoating costs and facility downtime
- Fast Installation: Single-pack system (no mixing) speeds application vs two-pack epoxy systems
Maintenance & Longevity
Cleaning: Sweep or scrub daily to remove abrasive dirt and debris. Pressure wash or scrub with industrial degreaser monthly. Avoid harsh solvents during first 7 days. Regular cleaning extends coating life significantly.
Expected Lifespan: 10-15 years in typical warehouse/factory environments with proper application and maintenance. 7-10 years in extreme forklift traffic or heavy industrial areas. 15+ years in moderate commercial garage use.
Damage Repair: Localised damage can be repaired without full recoat. Clean area, grind/abrade damaged zone, apply 1-2 repair coats. Feather edges for seamless repair. Keep spare material for touch-ups.
Recoating: Can be recoated after 7-12 years to refresh appearance and restore slip resistance. Thorough cleaning and light abrasion required for inter-coat adhesion. No primer needed if existing coating is sound.
Safety & Compliance
- R11 Slip Resistance: Exceeds HSE workplace safety requirements for industrial wet areas and reduces slip/trip accidents by up to 85%
- Colour Zoning Compliance: Supports HSE guidance on floor marking for pedestrian/vehicle segregation and safety area designation
- Low VOC Formula: <140 g/L VOC content for safer application in occupied industrial facilities
- Fire Retardant: Class 1 fire rating provides additional safety in manufacturing and storage environments
- Food Safe Certification: Suitable for food processing facilities when fully cured – conforms to food contact standards
- COSHH Compliant: Meets UK workplace safety regulations – comprehensive safety data sheet available
Warranty & Delivery
Performance Guarantee: 10-year durability guarantee when applied to properly prepared substrates in accordance with technical data sheet by competent applicator or approved contractor.
UK Stock: Held in UK warehouse for fast dispatch to industrial and commercial sites. Most orders ship within 24-48 hours.
Free Delivery: Free standard delivery on orders over £100. Express and timed delivery options available for urgent projects.
Bulk Discounts: Volume pricing available for large projects (100L+). Contact for quotation.
Hazardous Goods: Shipped as flammable liquid (UN1263) – signature required on delivery.
Technical Support & Project Services
Our industrial floor coating specialists provide comprehensive support for large-scale projects:
- Free site surveys and substrate assessment for projects over 500m²
- Detailed specification writing and tender support for contractors
- Colour consultation and safety zoning layout design per HSE guidance
- Application training and approved contractor recommendations
- Project management support for multi-phase installations
- Bulk pricing and scheduled delivery for large warehouse projects (1000L+)
- Custom colour matching for corporate branding (minimum order quantities apply)
Frequently Asked Questions
- What makes Supercoat different from standard garage floor paint?
- Supercoat is a factory-grade industrial coating with superior impact resistance, higher slip resistance rating (R11 vs R10), thicker film build (120-180 microns vs 80-100 microns), and significantly better abrasion resistance. It's engineered for forklift traffic, dropped loads, and extreme industrial use – not light domestic garage use. The lifespan is 10-15 years vs 2-5 years for standard garage paint.
- Do I need to prime industrial concrete before applying Supercoat?
- Yes, priming is mandatory for industrial applications. The Pre-Seal primer seals porous concrete, improves adhesion, reduces coating absorption, and ensures maximum bond strength under heavy traffic. Skipping primer in industrial environments significantly reduces coating lifespan and can lead to premature failure. For warranty compliance, always prime.
- Can forklifts drive on this coating?
- Yes, Supercoat is specifically designed for forklift traffic including electric, diesel, and LPG forklifts. Allow 48 hours before light forklift use, 7 days before full industrial operations. The high-impact formula and thick film build resist point loads, turning forces, and steel wheel abrasion that destroys standard floor paints.
- How do I calculate coverage for a large warehouse?
- Measure total floor area in m². Use conservative 8 m²/L coverage rate for industrial concrete. Multiply by 2 for two coats. Add 20% for wastage and repairs. Example: 500m² warehouse ÷ 8 = 62.5L per coat × 2 = 125L total + 20% = 150L required. Order eight 20L tins (160L total). Don't forget primer – same coverage calculation.
- What colours are best for warehouse safety zoning?
- Follow HSE guidance: Grey for general traffic areas, Yellow for forklift routes and caution zones, Green for pedestrian walkways and safe zones, Red for restricted areas and fire equipment zones, Blue for quality control or clean areas, White for line marking and aisle designation. Use high-contrast combinations for maximum visibility.
- Can this be applied over existing epoxy floor coating?
- Yes, if the existing epoxy is sound, well-adhered, and fully cured. Thoroughly clean and abrade the surface with 40-60 grit to provide mechanical key. Test a small area first (1m²) and allow 7 days to verify adhesion. Remove any flaking, peeling, or incompatible coatings completely. For critical applications, consider full removal and fresh application.
- How long before we can resume full warehouse operations?
- Light foot traffic: 24 hours. Light vehicle traffic (vans, cars): 48 hours. Forklift operations: 48-72 hours. Full industrial use with heavy loads: 7 days. Full chemical resistance: 7 days. Plan installation during shutdown periods or work in phases to maintain partial operations. Cooler temperatures extend cure times – add 50% below 15°C.
- Is this suitable for cold storage or refrigerated warehouses?
- Yes, once fully cured, Supercoat performs well in cold storage down to -30°C. However, application must occur at +10°C to +25°C. For refrigerated facilities, apply coating before cold storage activation, or temporarily heat the area during application and cure. Consult technical support for cold storage projects.
- What's the best way to maintain the coating in high-traffic areas?
- Daily sweeping or scrubbing to remove abrasive grit. Weekly degreasing of oil-contaminated areas. Monthly pressure washing of entire floor. Immediate cleanup of chemical spills. Annual inspection for damage with touch-up repairs as needed. Proper maintenance can extend lifespan from 10 years to 15+ years.
About Us
Suppliers to Ministry of Defence, NATO, US Airforce and Most UK Councils, Schools, Universities, Hospitals & various Government departments
Payment & Security
Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.
