{"product_id":"heavy-duty-ground-protection-mat-2400x1200x12mm-80-tonne","title":"Heavy Duty Ground Protection Mats 2.4m x 1.2m x 12mm | 80 Tonne HDPE Access Mat for Plant \u0026 Site Roadways","description":"\u003cp\u003e\u003cstrong\u003eThe 8 x 4 heavy-duty access mat that keeps tracked plant, telehandlers and delivery wagons moving when the ground gives up.\u003c\/strong\u003e Each 2.4m x 1.2m board is pressed from 12mm solid high-density polyethylene. It spreads a machine's weight over almost three square metres, so wheels and tracks stay on top of soft clay, wet turf and made ground instead of rutting into it. Lay a run in minutes, drive on it straight away, lift it at the end of the job and leave the grass behind you intact.\u003c\/p\u003e\n\n\u003ch2\u003eWhy site teams choose this mat\u003c\/h2\u003e\n\u003cul\u003e\n\u003cli\u003e\n\u003cstrong\u003eRated for 80 tonnes, tested to 120 tonnes.\u003c\/strong\u003e That covers 13 to 20 tonne excavators, loaded telehandlers, mobile crane outriggers, concrete wagons and articulated deliveries, depending on ground conditions.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eGrips when it is wet.\u003c\/strong\u003e A raised chevron tread runs in four zones across the face, giving tyres and boots traction in rain and mud. There is no slick, flat face to slide on.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eLight enough to lay by hand.\u003c\/strong\u003e At 35kg, two operatives can carry and position a mat using the six moulded handholes, with no lifting equipment needed on site.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eBuilds a continuous roadway.\u003c\/strong\u003e Twelve pre-drilled connection holes let you lock mats side to side and end to end with standard 2-way or 4-way mat connectors, so the route does not creep apart under turning loads.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eWill not rot, splinter or absorb water.\u003c\/strong\u003e Unlike timber bog mats, HDPE does not swell, warp or carry contamination between sites. Jet-wash it clean and it is ready for the next job.\u003c\/li\u003e\n\u003cli\u003e\n\u003cstrong\u003eMade from recycled plastic.\u003c\/strong\u003e Each board is 100% recycled HDPE, around 900 bottles' worth, and fully recyclable at the end of its working life.\u003c\/li\u003e\n\u003c\/ul\u003e\n\n\u003ch2\u003eWhere it earns its keep\u003c\/h2\u003e\n\u003cp\u003eGroundworks and housing sites where plant must cross finished lawns or soft verges. Utility and cable-laying crews working across farmland. Tree surgeons getting a chipper and MEWP to the back of a garden. Event organisers building vehicle routes, car parks and production compounds on showground grass. Crane hire firms needing a stable, level base under outrigger pads. Anywhere the job needs firm access today and the ground has to be handed back undamaged tomorrow.\u003c\/p\u003e\n\n\u003ch2\u003eHow many mats do I need?\u003c\/h2\u003e\n\u003cp\u003eEach mat covers 2.88m². For a single-lane roadway, lay the mats with the 2.4m length across the route: every mat adds 1.2m of road, so a 10m access run takes 9 mats and a 25m run takes 21. For a hardstanding or crane pad, divide the area in square metres by 2.88 and round up. If in doubt, send us your route length and the heaviest vehicle using it and we will work out the quantity for you.\u003c\/p\u003e\n\n\u003ch2\u003eLaying tips from the field\u003c\/h2\u003e\n\u003col\u003e\n\u003cli\u003eStrip loose debris and level obvious ridges so each mat sits flat with full ground contact.\u003c\/li\u003e\n\u003cli\u003eLay mats butt-jointed, never overlapped, and connect them through the pre-drilled holes before the first vehicle crosses.\u003c\/li\u003e\n\u003cli\u003eDrive steadily and avoid sharp tracked turns on the mats; pivot-steering under load is what damages boards and connectors.\u003c\/li\u003e\n\u003cli\u003eOn very soft ground, double up with a second layer at 90 degrees under the wheel path to spread the load further.\u003c\/li\u003e\n\u003c\/ol\u003e\n\n\u003ch2\u003eSpecification\u003c\/h2\u003e\n\u003ctable style=\"width:100%; border-collapse:collapse; margin:20px 0;\"\u003e\n\u003ctbody\u003e\n\u003ctr\u003e\n\u003ctd style=\"padding:10px; border:1px solid #dee2e6;\"\u003e\u003cstrong\u003eSize\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd style=\"padding:10px; border:1px solid #dee2e6;\"\u003e2400mm x 1200mm (8ft x 4ft)\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd style=\"padding:10px; border:1px solid #dee2e6;\"\u003e\u003cstrong\u003eThickness\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd style=\"padding:10px; border:1px solid #dee2e6;\"\u003e12mm solid\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd style=\"padding:10px; border:1px solid #dee2e6;\"\u003e\u003cstrong\u003eCoverage\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd style=\"padding:10px; border:1px solid #dee2e6;\"\u003e2.88m² per mat\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd style=\"padding:10px; border:1px solid #dee2e6;\"\u003e\u003cstrong\u003eWeight\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd style=\"padding:10px; border:1px solid #dee2e6;\"\u003e35kg per mat\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd style=\"padding:10px; border:1px solid #dee2e6;\"\u003e\u003cstrong\u003eLoad rating\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd style=\"padding:10px; border:1px solid #dee2e6;\"\u003e80 tonnes suggested, tested to 120 tonnes (ground dependent)\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd style=\"padding:10px; border:1px solid #dee2e6;\"\u003e\u003cstrong\u003eMaterial\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd style=\"padding:10px; border:1px solid #dee2e6;\"\u003e100% recycled high-density polyethylene (HDPE), fully recyclable\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd style=\"padding:10px; border:1px solid #dee2e6;\"\u003e\u003cstrong\u003eSurface\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd style=\"padding:10px; border:1px solid #dee2e6;\"\u003eAnti-slip chevron tread\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd style=\"padding:10px; border:1px solid #dee2e6;\"\u003e\u003cstrong\u003eHandholes\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd style=\"padding:10px; border:1px solid #dee2e6;\"\u003e6\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd style=\"padding:10px; border:1px solid #dee2e6;\"\u003e\u003cstrong\u003eConnection holes\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd style=\"padding:10px; border:1px solid #dee2e6;\"\u003e12 (connectors not included)\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd style=\"padding:10px; border:1px solid #dee2e6;\"\u003e\u003cstrong\u003eColour\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd style=\"padding:10px; border:1px solid #dee2e6;\"\u003eBlack\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd style=\"padding:10px; border:1px solid #dee2e6;\"\u003e\u003cstrong\u003eCondition\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd style=\"padding:10px; border:1px solid #dee2e6;\"\u003eNew\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd style=\"padding:10px; border:1px solid #dee2e6;\"\u003e\u003cstrong\u003eDelivery\u003c\/strong\u003e\u003c\/td\u003e\n\u003ctd style=\"padding:10px; border:1px solid #dee2e6;\"\u003ePalletised, up to 30 mats per pallet. Larger orders need offloading by forklift or HIAB on arrival.\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\n\u003c\/table\u003e\n\n\u003ch2\u003eFrequently asked questions\u003c\/h2\u003e\n\u003cp\u003e\u003cstrong\u003eWill these mats carry a 20 tonne excavator?\u003c\/strong\u003e\u003cbr\u003eYes. The mat is rated for 80 tonnes and tested to 120 tonnes. On very soft or waterlogged ground, add a second layer under the tracks.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eCan I drive a car or van straight onto them?\u003c\/strong\u003e\u003cbr\u003eYes. The tread gives tyres grip from the first mat, and the 12mm profile is low enough to drive on without ramps.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eDo they protect lawns?\u003c\/strong\u003e\u003cbr\u003eThey spread the load so the grass is pressed rather than cut and rutted. For short jobs, the turf usually recovers within days of the mats being lifted.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHow do I join them together?\u003c\/strong\u003e\u003cbr\u003eUse standard 2-way connectors along straight runs and 4-way connectors where four corners meet, bolted through the pre-drilled connection holes.\u003c\/p\u003e\n\u003cp\u003e\u003cstrong\u003eHow long do they last?\u003c\/strong\u003e\u003cbr\u003eHDPE does not rot or absorb water, so with sensible use a mat gives many years of repeated deployments. Avoid aggressive tracked pivot turns to get the longest life.\u003c\/p\u003e\n","brand":"Industrial Supplies Co","offers":[{"title":"Default Title","offer_id":57226184196483,"sku":"GPM-819223-NEW","price":288.9,"currency_code":"GBP","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0621\/3002\/8778\/files\/heavy-duty-ground-protection-mat-excavator-site-roadway-d9b3c53c-1a87-4b80-9c47-9d09cfc4c9e1.jpg?v=1794745714","url":"https:\/\/industrialsuppliesco.co.uk\/products\/heavy-duty-ground-protection-mat-2400x1200x12mm-80-tonne","provider":"industrialsuppliesco.co.uk","version":"1.0","type":"link"}